[1]
Efendi, A. and Talanipa, R. 2019. EVALUASI WAKTU MENGGUNAKAN CRITICAL PATH METHOD (CPM) PADA PROYEK JALAN RABAT BETON DESA KAMELANTA. Sang Pencerah: Jurnal Ilmiah Universitas Muhammadiyah Buton. 5, 1 (Jun. 2019), 1–6. DOI:https://doi.org/10.35326/pencerah.v5i1.316.